Request Calculation

Demo Site — Chyhyryn (500 kW)

Objective: Thermodynamic cycle verification, PCM storage validation, and 500 kW grid output. Region's first operational CAES+PCM prototype.

Download Report

Scaling Site — Baryshivka (2.5 MW)

Status: Engineering Design. Capacity: 2.5 MW. Commercial operation to balance an industrial hub and optimize energy costs.

View Scaling Docs